Melbourne Grammar School

The new Geoff Handbury Science and Technology Hub at Melbourne Grammar School is a simple, singular sculptural structure. The construction of the new five-level Science and Technology Hub replaces the existing science building. The cutting edge design of this building facilitates scientific and technological investigations.

BRD Industries was engaged by Kane Construction to complete the full structure package. The project was interesting with its rounded floor plate shapes & BubbleDeck formwork system which provided some challenges during construction.

This was BRD’s 25th project with Kane Construction – a testament to our clients entrusting us with repeat business.

Client 

Sructural Engineer

Site Address

Project Value

Structure Build Time

Kane Construction

Irwin Consult

47 Domain Street, Melbourne

>$30M

6 months

The new Geoff Handbury Science and Technology Hub at Melbourne Grammar School is a simple, singular sculptural structure. The construction of the new five level Science and Technology Hub replaces the existing science building. The cutting edge design of this building facilitates scientific and technological investigations.

BRD Industries was engaged by Kane Construction to complete the full structure package. The project was interesting with its rounded floor plate shapes & BubbleDeck formwork system which provided some challenges during construction.

This was BRD’s 25th project with Kane Construction – a testament to our clients entrusting us with repeat business.

Client   Kane Construction
Sructural Engineer   Irwin Consult
Site Address   47 Domain Street, Melbourne
Project Value   >30M
Structure build time   6 months