BRD was engaged by Hutchinson Builders to complete a 3000m2 car park on top of an existing structure. The project was broken up into many stages to work within a live car park environment as per the request of Ramsay Health. All in all, we managed to complete the band beam & BONDEK® structure whilst keeping the car park open with minimal disruptions to patients.
Client
Sructural Engineer
Site Address
Project Value
Structure build time
Hutchinson Builders
Taylor Thompson Whitting (TTW)
525 Mclelland Drive Frankston
>$35M
9 months
BRD was engaged by Hutchinson Builders to complete a 3000m2 car park on top of an existing structure. The project was broken up into many stages to work within a live car park environment as per the request of Ramsay Health. All in all, we managed to complete the band beam & BONDEK® structure whilst keeping the car park open with minimal disruptions to patients.
Client Hutchinson Builders
Sructural Engineer Taylor Thompson Whitting (TTW)
Site Address 525 Mclelland Drive Frankston
Project Value >35M
Structure build time 9 months
The new Geoff Handbury Science and Technology Hub at Melbourne Grammar School is a simple, singular sculptural structure. The construction of the new five-level Science and Technology Hub replaces the existing science building. The cutting edge design of this building facilitates scientific and technological investigations.
BRD Industries was engaged by Kane Construction to complete the full structure package. The project was interesting with its rounded floor plate shapes & BubbleDeck formwork system which provided some challenges during construction.
This was BRD’s 25th project with Kane Construction – a testament to our clients entrusting us with repeat business.
Client
Sructural Engineer
Site Address
Project Value
Structure Build Time
Kane Construction
Irwin Consult
47 Domain Street, Melbourne
>$30M
6 months
The new Geoff Handbury Science and Technology Hub at Melbourne Grammar School is a simple, singular sculptural structure. The construction of the new five level Science and Technology Hub replaces the existing science building. The cutting edge design of this building facilitates scientific and technological investigations.
BRD Industries was engaged by Kane Construction to complete the full structure package. The project was interesting with its rounded floor plate shapes & BubbleDeck formwork system which provided some challenges during construction.
This was BRD’s 25th project with Kane Construction – a testament to our clients entrusting us with repeat business.
Parliament House Office Accommodation is a new freestanding, two-level office building with a roof garden which was constructed to the east of the existing heritage listed Parliament House.
BRD was engaged by Cockram Construction (now ICON) to build 102 new offices, a breakout area and amenities for the Members of Parliament. This was a special project for us as not only is it a prestigious project in the heart of Melbourne, it also involved the use of BubbleDeck Formwork which is a new formwork system which saves concrete through the use of proprietary air bubbles in the slab.
BRD’s scope of work involved the structural works to the footings, ground slab, suspended slabs and the installation of BubbleDeck.
Client
Sructural Engineer
Site Address
Project Value
Structure Build Time
Icon
Irwin Consult
Spring St, East Melbourne
>$30M
7 months
Parliament House Office Accommodation is a new freestanding, two-level office building with a roof garden which was constructed to the east of the existing heritage listed Parliament House.
BRD was engaged by Cockram Construction (now ICON) to build 102 new offices, a break out area and amenities for the Members of Parliament. This was a special project for us as not only is it a prestigious project in the heart of Melbourne, it also involved the use of BubbleDeck Formwork which is a new formwork system which saves concrete through the use of proprietary air bubbles in the slab.
BRD’s scope of work involved the structural works to the footings, ground slab, suspended slabs and the installation of BubbleDeck.
Client
Site Address
Project Value
Structure Build Time
Hutchinson Builders
Lot 8-16 Grey Street, Ringwood
>$12M
4 months
Project Value >$12M
Structure Build Time 4 months
Client
Site Address
Project Value
Structure Build Time
Hutchinson Builders
477 Graham Street, Port Melbourne
>$35M
6 months
Project Value >$35M
Structure Build Time 6 months